dribs 24 June 2009
Well, in dribs and drabs (and with no apparent urgency), the builders are tackling the ‘finishing’ of their work here – as usual, I will put a horrible perspective on this by saying that it was originally a 5 month job that has become over a year’s worth of them being here…hmmm…SO the ‘leak’ from the tank in the roof, and the awfullest waste of water I have seen in a LONG time, seems to have been dealt with now – and yet the morning may bring its own verdict on that. A few more tiles have appeared. There may be magicians – sorry, electricians – on site tomorrow. We’ll see, we’ll see…
I am to do a talk at Dundee Literary Festival on Saturday (27th), 4 – 5 pm so anyone in the area is most welcome along to that.
Anyone know anything about synching i-pods? I want to synch my music onto it but not the spoken word stuff – please advise.
And how about this for a travel schedule over the weekend – I go Dublin to London Friday (cab, plane, tube), then London to Dundee and back to Edinburgh on Saturday (tube, plane, car, car), then Edinburgh to London on Sunday (train, tube) and later Sunday London to Johannesburgh (tube, plane) arriving 6.20 AM Monday morning in Sith Ifricah…righto so…